After replacing the sub floor and tearing out the tile around the bath tub, we needed to replace the wall with cement backer board and place cement backer board on the floor as well for water proofing. We set about cutting the backer board to the correct dimensions and marked out holes for the toilet drain and shower fixtures.
At this point the semester had started so neither me nor my brother had the time to cut and lay tile, so we hired a contractor to do it. He set in the backer boards and laid the tile, but he took his sweet time doing it and we were getting over our established budget so we fired that guy.
At this point all we had to do was grout the. So we did.
At this point we just had to clean it up and install the toilet, sink, and shower fixtures and put on the finishing touches.
Here is what that looked like:
All done. Well, mostly. There's still some caulking to be done around the tiles on the wall, but I'll get to that some other time.